Business overview
- As the recent buildings are enlarged and their systems become complicated, the importance of design planning is empathized considering efficiency, stability, maintenance convenience of the equipment, and so on. In addition, the demands of energy saving have been increased due to the change of national policy paradigm on the energy and the global environmental regulations due to climate changes. The trend will be continued to pressure the managements of the enterprises and also will play a big burden for personal and national operations.
- The Company R&C Center develops the technologies and new businesses to enhance the energy efficiency, and performs multiple R&D works to save the energy in the buildings and industries.
Main tasks
Swipe to check
Item | Task |
---|---|
R&D projects |
Improve equipment system Perform R&D projects on enhancement of energy efficiency by EMS Perform R&D projects on saving energy and greenhouse gases in the industrial facilities and buildings |
Technology development of equipment system optimization |
Design optimal air-conditioning system and develop its operation technology Develop technology to optimize facility system |
Technology development to enhance building energy efficiency |
Develop optimal design technology for new buildings Develop technology to enhance energy efficiency in the existing buildings Certification works of building energy |
Procedure
R&D projects
- R&D for technology of equipment system enhancement
- R&D for technology of energy efficiency enhancement by EMS
- Research for energy consumption operation control of smart city
Technology development of equipment system optimization
- Design optimal air-conditioning system and develop its operation technology
- Define optimal design plan by LCC evaluation to analyze the building loads and select the most economic system using the programs such as RTS-SAREK (domestic), Elite, E-II (overseas), and so on, and develop operating technology to save energy and enhance efficiency at the maintenance stage
- Optimal technology development for pipe network of equipment system
- Review the pipe network with hydraulic calculation by PIPENET/SPRINKLER MODULE program developed according to 13, 15, and 16 of the National Fire Protection Association (NFPA) guideline to install sprinkler system, and develop the design technology to define the optimal design of firefighting equipment
- Technology development to enhance building energy efficiency
- Develop optimal design technology for new buildings
- Develop technology to enhance energy efficiency in the existing buildings
- Certification works of building energy (certification consulting to realize low energy and ecofriendly building)