New renewable energy means the clean energy using sunlight, solar heat, fuel cell, and so on. This will resolve the recent issues of fossil energy depletion and multiple efforts have been made to expand the supply of new renewable energy to lessen the emission of greenhouse gases. In particular, the Korean government performs the qualitative enhancement policy through selections of the specialized companies for new renewable energy as well as quantitative expansion policy through supporting some portion of installation costs, parallelly.
SINIL E&C was selected as a participant company in the governmental supporting project for new renewable energy with the Korea Energy Agency in 2010, and has performed overall tasks in the installations of new renewable energy from application consulting up to design and construction.

Main tasks

Swipe to check

Item Task
Technology consulting for new renewable energy Analyze the influential elements for the system application and review the application validity

Trend analysis of energy usage (heating, cooling, and consumption amount)

Environmental factor analysis (existing facility system, surrounding environment)

Feasibility analysis of installation subsidy

Governmental support and supply project of new renewable energy Support customers to be subsidized partially for the installation costs of new renewable energy from governmental funds such as housing and building support project, convergence and integration supporting project, etc.

Housing and building support project

Convergence and integration supporting project

Installation of new renewable energy system As a participating vendor for new renewable energy assigned by the Korea Energy Agency, try to satisfy the customers by supporting them with excellent installation quality and maintenance.

Project of new renewable energy generation

Installation project of new renewable energy in the buildings (Green Home, general buildings)

Procedure

  • Step 01

    Consulting
    Identify the customer’s requirements and suggest the technology review report in alignment with the governmental project
  • Step 02

    Contract
    Contract making for installation of new renewable energy equipment
  • Step 03

    Equipment design
    Define optimal design plan considering environmental and economic elements
  • Step 04

    Installation
    Install considering quality, process, and safety
  • Step 05

    Maintenance
    Continuous maintenance for optimal efficiency