• Home

Business Overview

TAB is the system optimization technology securing the performances and quality of air conditioning equipment, extending the life of equipment, saving energy, preventing noise, pursuing the comfort of indoor environment, and so on.
SINIL E&C holds the technologies and equipment to be able to perform TAB & commissioning works on a variety of systems including clean room (GLP/GMP/HACCP), firefighting and smoke discharging, as well as TAB experts by field that can summarize and analyze the results of test, adjustment, and evaluation.

Main tasks

Swipe to check

Item Work scope
TAB Air-conditioning equipment

Review air-conditioning equipment system

Onsite inspection

Check performance of air-conditioner

Class balancing and adjustment

Measure indoor noise, temperature, and humidity

Write TAB report

Smoke discharging equipment

Review wind distribution system

Onsite checking of smoke discharging system

Adjustment of smoke discharging area system

Check performance of ventilator and automatic control

Write TAB report of smoke discharging

Ventilation equipment in the apartments

Review ventilation unit system

Onsite inspection of ventilating equipment

System balancing and adjustment

Check performance of ventilation unit

Measure indoor noise level

Write TAB report

Commissioning

Review building owner’s requirements

Review design basic materials

Review basic design and working design

Installation validation test

Performance test

Training of operating manager

Write system manual

Write commissioning report

Clean room
(GLP/GMP/HACCP)

Filter Leakage

Filter Face Velocity

Airborne Particle Count

Airflow Parallelism

Room Differential Pressure

Vibration Level

Procedure

  • Step 01

    Establish TAB execution plan
  • Step 02

    System review
  • Step 03

    Onsite investigation
  • Step 04

    Test, adjustment, and evaluation
  • Step 05

    Pilot operation of equipment
  • Step 06

    Report writing